PROJECTS

Melaka Refinery, Malaysia

Customer
Malaysia
Location
Malaysia
Melaka Refinery, Malaysia

Integrated Electricity and Water Plant in Duqm, Oman

Location
Oman
Integrated Electricity and Water Plant in Duqm, Oman

Port of Fujairah Terminals, UAE

Customer
ERIELL Group
Year
2012
Location
UAE
Port of Fujairah Terminals, UAE
Electric Heating Systems
Total cable length 9 350 m
Total systems output 282 kW
Heating Systems Application
  • Pipelines

Melaka Refinery, Malaysia

Customer
ERIELL Group
Year
2012
Location
Malaysia
Melaka Refinery, Malaysia
Electric Heating Systems
Total cable length 9 350 m
Total systems output 282 kW
Heating Systems Application
  • Pipelines

Integrated Electricity and Water Plant in Duqm, Oman

Customer
ERIELL Group
Year
2012
Location
Oman
Integrated Electricity and Water Plant in Duqm, Oman
Electric Heating Systems
Total cable length 9 350 m
Total systems output 282 kW
Heating Systems Application
  • Pipelines

Kumho Mitsui Chemicals Plant

Customer
Kumho Mitsui Chemicals, Inc.
Year
2009
Location
Korea
Kumho Mitsui Chemicals Plant
Electric Heating Systems
Total length heated15 000 m
Total system output 488 kW
Skin-Effect Heating Systems
Number of feeding points2
Pipes diameter159 mm
Maintenance temperature+20 °C
Transported productsNitrobenzol

Shchekinoazot Chemical Plant

Customer
Shchekinoazot Ltd.
Year
2011
Location
Russia
  • Shchekinoazot Chemical Plant
  • Shchekinoazot Chemical Plant
  • Shchekinoazot Chemical Plant
Electric Heating Systems
Total length heated 8 000 m
Total system output 410 kW
Heating Systems Application
  • Methanol M-450 producing plant
  • CFC and formalin producing plant
  • Impulse lines of Pervomayskaya power plant

Port of Fujairah Terminals, UAE

Customer
UAE
Year
2023
Location
UAE
Port of Fujairah Terminals, UAE
Electric Heating Systems
total cable length5,900 m
total system output260 kW

Urga is a natural gas field, located in the north-west of Uzbekistan, in the former Aral Sea area. In 2011, the recoverable gas reserves in the field were estimated at 25.9 billion cubic meters of gas.

In 2012 SST Group participated in the Urga field modernization. The project target was to build a new boosting compressor station and crude gas processing and compressing plant. ERIELL, the main contractor of Urga field modernization, chose SST Group as an electric heating systems provider.

Leave a request for your project: