PROJECTS

Urga Gas Field

Customer
ERIELL Group
Year
2012
Location
Uzbekistan
  • Urga Gas Field
  • Urga Gas Field
  • Urga Gas Field
Electric Heating Systems
Total cable length 9 350 m
Total systems output 282 kW
Heating Systems Application
  • Pipelines

Vysotsk LNG Terminal

Customer
CryoGAS Group
Year
2018-2019
Location
Russia
  • Vysotsk LNG Terminal
  • Vysotsk LNG Terminal
Electric Heating Systems
Total cable length 16 673 m
Total systems output 300 kW
Heating Systems Application
  • 16 modular units
  • Tanks
  • Pipelines

Kumho Mitsui Chemicals Plant

Customer
Kumho Mitsui Chemicals, Inc.
Year
2009
Location
Korea
Kumho Mitsui Chemicals Plant
Electric Heating Systems
Total length heated15 000 m
Total system output 488 kW
Skin-Effect Heating Systems
Number of feeding points2
Pipes diameter159 mm
Maintenance temperature+20 °C
Transported productsNitrobenzol

Shchekinoazot Chemical Plant

Customer
Shchekinoazot Ltd.
Year
2011
Location
Russia
  • Shchekinoazot Chemical Plant
  • Shchekinoazot Chemical Plant
  • Shchekinoazot Chemical Plant
Electric Heating Systems
Total length heated 8 000 m
Total system output 410 kW
Heating Systems Application
  • Methanol M-450 producing plant
  • CFC and formalin producing plant
  • Impulse lines of Pervomayskaya power plant

Urga is a natural gas field, located in the north-west of Uzbekistan, in the former Aral Sea area. In 2011, the recoverable gas reserves in the field were estimated at 25.9 billion cubic meters of gas.

In 2012 SST Group participated in the Urga field modernization. The project target was to build a new boosting compressor station and crude gas processing and compressing plant. ERIELL, the main contractor of Urga field modernization, chose SST Group as an electric heating systems provider.

Leave a request for your project: